Zum Hauptinhalt springen
Nicht aus der Schweiz? Besuchen Sie lehmanns.de
Construction Scheduling, Cost Optimization and Management - Hojjat Adeli, Asim Karim

Construction Scheduling, Cost Optimization and Management

Buch | Softcover
338 Seiten
2019
CRC Press (Verlag)
978-0-367-86380-7 (ISBN)
CHF 119,95 inkl. MwSt
  • Versand in 15-20 Tagen
  • Versandkostenfrei
  • Auch auf Rechnung
  • Artikel merken
This book provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization.
Construction Scheduling, Cost Optimization and Management presents a general mathematical formula for the scheduling of construction projects. Using this formula, repetitive and non-repetitive tasks, work continuity considerations, multiple-crew strategies, and the effects of varying job conditions on the performance of a crew can be modelled. This book presents an entirely new approach to the construction scheduling problem. It provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization, including construction engineers, highway engineers, transportation engineers, contractors and architects. It will also be useful for researchers, and graduates on courses in construction scheduling and planning.

Hojjat Adeli is Professor of Civil and Environmental Engineering and Geodtic Science and Director of Knowledge Engineering Lab at The Ohio State University. He is a leading, world-renowned researcher and inventor and author of 340 research publications including nine highly acclaimed and pioneering books in the general field of computer-aided engineering (CAE). His ground-breaking research has appeared in 54 different scholarly journals covering many disciplines and had a profound impact on the direction of CAE research. He is the Editor-in-Chief of two prestigious journals Computer-Aided Civil and Infrastructure Engineering and Integrated Computer-Aided Engineering. He is the recipient of numerous awards and honours. In 1998, he was awarded the University Distinguished Scholar Award by The Ohio State University.

1. Review of Construction Scheduling and Management Methods. 2. Neural Dynamics Model of Adeli and Park and its Application to Engineering Design. 3. A General Mathematical Formulation for Scheduling of Construction Projects with Construction Cost Optimization. 4. Solution of Construction Scheduling and Cost Optimization with Neural Dynamics. 5. An Object-Oriented Information Model for Construction Project Management. 6. CONSCOM: An Object-Orient Construction Scheduling and Change Management System. 7. Integrated Management Environment and User Interface. 8. Regularization Neural Network for Construction Cost Estimation. References. Appendix Nomenclature.

Erscheinungsdatum
Verlagsort London
Sprache englisch
Maße 156 x 234 mm
Gewicht 650 g
Themenwelt Naturwissenschaften Biologie Ökologie / Naturschutz
Technik Bauwesen
Technik Bergbau
Technik Umwelttechnik / Biotechnologie
ISBN-10 0-367-86380-4 / 0367863804
ISBN-13 978-0-367-86380-7 / 9780367863807
Zustand Neuware
Informationen gemäß Produktsicherheitsverordnung (GPSR)
Haben Sie eine Frage zum Produkt?
Mehr entdecken
aus dem Bereich
Gewinnung - Aufbereitung - Speicherung - Verteilung

von Frank Hoffmann; Stefan Grube

Buch | Softcover (2022)
Springer Vieweg (Verlag)
CHF 55,95
das Leben unter unseren Füßen

von Nicole Ottawa; Oliver Meckes; Veronika Straaß …

Buch | Hardcover (2024)
Dölling und Galitz (Verlag)
CHF 44,90