Zum Hauptinhalt springen
Nicht aus der Schweiz? Besuchen Sie lehmanns.de
Construction Scheduling, Cost Optimization and Management - Hojjat Adeli, Asim Karim

Construction Scheduling, Cost Optimization and Management

Buch | Hardcover
338 Seiten
2001
CRC Press (Verlag)
978-0-415-24417-6 (ISBN)
CHF 357,85 inkl. MwSt
This book provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization.
Construction Scheduling, Cost Optimization and Management presents a general mathematical formula for the scheduling of construction projects. Using this formula, repetitive and non-repetitive tasks, work continuity considerations, multiple-crew strategies, and the effects of varying job conditions on the performance of a crew can be modelled. This book presents an entirely new approach to the construction scheduling problem. It provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization, including construction engineers, highway engineers, transportation engineers, contractors and architects. It will also be useful for researchers, and graduates on courses in construction scheduling and planning.

Hojjat Adeli is Professor of Civil and Environmental Engineering and Geodtic Science and Director of Knowledge Engineering Lab at The Ohio State University. He is a leading, world-renowned researcher and inventor and author of 340 research publications including nine highly acclaimed and pioneering books in the general field of computer-aided engineering (CAE). His ground-breaking research has appeared in 54 different scholarly journals covering many disciplines and had a profound impact on the direction of CAE research. He is the Editor-in-Chief of two prestigious journals Computer-Aided Civil and Infrastructure Engineering and Integrated Computer-Aided Engineering. He is the recipient of numerous awards and honours. In 1998, he was awarded the University Distinguished Scholar Award by The Ohio State University.

1. Review of Construction Scheduling and Management Methods. 2. Neural Dynamics Model of Adeli and Park and its Application to Engineering Design. 3. A General Mathematical Formulation for Scheduling of Construction Projects with Construction Cost Optimization. 4. Solution of Construction Scheduling and Cost Optimization with Neural Dynamics. 5. An Object-Oriented Information Model for Construction Project Management. 6. CONSCOM: An Object-Orient Construction Scheduling and Change Management System. 7. Integrated Management Environment and User Interface. 8. Regularization Neural Network for Construction Cost Estimation. References. Appendix Nomenclature.

Erscheint lt. Verlag 25.1.2001
Verlagsort London
Sprache englisch
Maße 156 x 234 mm
Gewicht 703 g
Themenwelt Technik Bauwesen
ISBN-10 0-415-24417-X / 041524417X
ISBN-13 978-0-415-24417-6 / 9780415244176
Zustand Neuware
Informationen gemäß Produktsicherheitsverordnung (GPSR)
Haben Sie eine Frage zum Produkt?
Mehr entdecken
aus dem Bereich
Statik, Reibung, Dynamik, Festigkeitslehre, Fluidmechanik

von Alfred Böge; Wolfgang Böge

Buch | Hardcover (2024)
Springer Vieweg (Verlag)
CHF 55,95