Fundamentals of Construction Project Delivery Systems
Routledge (Verlag)
978-1-041-04561-8 (ISBN)
- Noch nicht erschienen (ca. April 2026)
- Versandkostenfrei
- Auch auf Rechnung
- Artikel merken
Unlike conventional perspectives that view project delivery as a mere administrative process and a set of rules/features, this book challenges this notion. It proposes a shift in perspective, positioning project delivery system as a design endeavour to define an organizational structure. Here, the owner is envisioned as actively adjusting the degree of organizational integration and interest alignment responding to the given internal and external context. Divided into four parts, the book begins by introducing project delivery systems before covering selection methods and contract types in part two. The third section goes into detail on four delivery project methods: Design-Bid-Build, CM-at-Risk, Design-Build, and Integrated Project Delivery and follows a similar chapter structure with a case study to demonstrate the method. The final part looks to the future covering new procurement trends, innovation, culture, and efficiency.
This book offers practical guidance on how owners can effectively leverage integrated approaches to enhance project outcomes. For educational purposes, the book offers guidance for undergraduate and graduate students in project delivery method courses within construction management programs.
Yong-Woo Kim is a full Professor and P.D.Koon Endowed Professorship holder at the University of Washington. Dr. Kim’s main research interests include project-based production management, lean construction, supply chain management, and integrated project delivery systems. Over the last 25 years, he has offered teaching and training on the project delivery system, project management, and lean construction not only in the classroom, but also to industry professionals.
Part A. Introduction. 1. Introduction to the Project Delivery System. Part B. Selection Method and Contract. 2. Selection Method in the Project Delivery Systems. 3. Compensation Structure. Part C. Project Delivery Method. 4. Design-Bid-Build (DBB). 5. Construction Management at Risk (CMAR). 6. Design Build (DB). 7. Integrated Project Delivery (IPD). Part D. Moving Forward. 8. New Trends in the Project Delivery System. 9. Shift of Paradigm and Future.
| Erscheint lt. Verlag | 1.4.2026 |
|---|---|
| Zusatzinfo | 21 Tables, black and white; 15 Line drawings, black and white; 1 Halftones, black and white; 16 Illustrations, black and white |
| Verlagsort | London |
| Sprache | englisch |
| Maße | 152 x 229 mm |
| Themenwelt | Technik ► Bauwesen |
| Wirtschaft ► Betriebswirtschaft / Management ► Logistik / Produktion | |
| Wirtschaft ► Betriebswirtschaft / Management ► Projektmanagement | |
| ISBN-10 | 1-041-04561-1 / 1041045611 |
| ISBN-13 | 978-1-041-04561-8 / 9781041045618 |
| Zustand | Neuware |
| Informationen gemäß Produktsicherheitsverordnung (GPSR) | |
| Haben Sie eine Frage zum Produkt? |
aus dem Bereich