Guide to Good Practice in the Management of Time in Complex Projects (eBook)
176 Seiten
Wiley-Blackwell (Verlag)
978-1-4443-2960-5 (ISBN)
In simple projects, time can be managed intuitively by any reasonably competent person, but complex projects cannot and a more analytical approach is necessary if the project is to succeed. Although much has been written about how to apportion liability for delay after a project has gone wrong there was, until recently, no guidance on how to manage time pro-actively and effectively on complex projects.
In 2008, the CIOB embarked upon a 5-year strategy to provide standards, education, training and accreditation in time management. The first stage, this Guide to Good Practice in Managing Time in Complex Projects, sets down the process and standards to be achieved in preparing and managing the time model.
As a handbook for practitioners it uses logical step by step procedures and examples from inception and risk appraisal, through design and construction to testing and commissioning, to show how an effective and dynamic time model can be used to manage the risk of delay to completion of construction projects.
About the CIOB The Chartered Institute of Building is at the heart of a management career in construction. It is the world's largest and most influential professional body for construction management and leadership, with a Royal Charter to promote the science and practice of building and construction for the benefit of society. With over 48,000 members worldwide, the CIOB is the international voice of the building professional.
Table of figures.
Table of acronyms.
Time-Management Working-Group member and contributordetails.
Preface.
Acknowledgements.
1 Preamble.
1.1 Core principles.
1.2 Mission statement.
1.3 Genesis of the Guide.
1.4 Purpose of the Guide.
1.5 Applicability of the Guide.
1.6 Planning and scheduling.
1.7 The project scheduler.
1.8 Project control.
2 Strategy.
2.1 Planning.
2.2 Schedule preparation.
2.3 Schedule review.
2.4 Progress update.
2.5 Change management.
2.6 Planning method statement.
2.7 Record keeping.
2.8 Time-management quality control.
2.9 Communications.
3 Developing the time-model.
3.1 Introduction.
3.2 Developing the schedule.
3.3 Schedule types.
3.4 Scheduling techniques.
3.5 Resource planning and scheduling.
3.6 Software considerations.
3.7 Schedule design 26
3.8 Schedule preparation.
4 Managing the time-model.
4.1 Introduction.
4.2 Schedule review and revision.
4.3 Record keeping.
4.4 Updating the schedule.
4.5 Change control.
4.6 Progress monitoring.
5 Communicating and integrating the model.
5.1 Introduction.
5.2 Report types.
5.3 Reporting formats.
5.4 Feedback and benchmarking.
Benchmarking procedure.
APPENDICES.
1 Appendix 1 - Time risks which may be borne by theemployer.
2 Appendix 2 - Desirable attributes of schedulingsoftware.
3 Appendix 3 - Sample notice of delay.
4 Appendix 4 - Industry productivity guides common in theUK.
Glossary of terms.
Index.
"The Guide will benefit not only the construction industry, butalso other sectors such as the oil services, process and energyIndustries." (Project Manager Today, 1 January 2011)
"A new guide to help construction professionals keep control oftimescales on complex projects has been published by the CharteredInstitute of Building and Wiley Blackwell." (Self Build &Design, 1 March 2011)
"The guide will be beneficial to academics and students learningthe basics of time management, but it could also become a referencedocument for all parties involved in the delivery of complexprojects, including senior managers and clients". (ConstructionManager, 1 January 2011)
"This new handbook uses a logical step by step approach to showhow an effective time model can be used to manage the risk of delayto completion on construction projects. It demonstrates proceduresand examples from inception and risk appraisal, through design andconstruction, to testing and commissioning that show practitionersthe logical procedures to use". (Construction Now Daily, 4 January2011)
| Erscheint lt. Verlag | 19.10.2010 |
|---|---|
| Sprache | englisch |
| Themenwelt | Technik ► Bauwesen |
| Wirtschaft ► Betriebswirtschaft / Management ► Unternehmensführung / Management | |
| Schlagworte | Baubetrieb • Bauingenieur- u. Bauwesen • Civil Engineering & Construction • Construction Management |
| ISBN-10 | 1-4443-2960-X / 144432960X |
| ISBN-13 | 978-1-4443-2960-5 / 9781444329605 |
| Informationen gemäß Produktsicherheitsverordnung (GPSR) | |
| Haben Sie eine Frage zum Produkt? |
Größe: 5,1 MB
Kopierschutz: Adobe-DRM
Adobe-DRM ist ein Kopierschutz, der das eBook vor Mißbrauch schützen soll. Dabei wird das eBook bereits beim Download auf Ihre persönliche Adobe-ID autorisiert. Lesen können Sie das eBook dann nur auf den Geräten, welche ebenfalls auf Ihre Adobe-ID registriert sind.
Details zum Adobe-DRM
Dateiformat: PDF (Portable Document Format)
Mit einem festen Seitenlayout eignet sich die PDF besonders für Fachbücher mit Spalten, Tabellen und Abbildungen. Eine PDF kann auf fast allen Geräten angezeigt werden, ist aber für kleine Displays (Smartphone, eReader) nur eingeschränkt geeignet.
Systemvoraussetzungen:
PC/Mac: Mit einem PC oder Mac können Sie dieses eBook lesen. Sie benötigen eine
eReader: Dieses eBook kann mit (fast) allen eBook-Readern gelesen werden. Mit dem amazon-Kindle ist es aber nicht kompatibel.
Smartphone/Tablet: Egal ob Apple oder Android, dieses eBook können Sie lesen. Sie benötigen eine
Geräteliste und zusätzliche Hinweise
Buying eBooks from abroad
For tax law reasons we can sell eBooks just within Germany and Switzerland. Regrettably we cannot fulfill eBook-orders from other countries.
aus dem Bereich